Gasketing (FIPFG)
The machine is loaded and unloaded by a single employee per shift. This means labour costs of 0.04 € per part. For additionally incurred costs for energy, water, maintenance, waste disposal and material losses an extra cost of 10% is factored in, i.e. 0.01 €/part.
Get Price